Photos - Spring 2022 to Project Completion
Photos are arranged with the most recent photos on top:
Bridge joint work on the Charter Oak Bridge - 11/18/2022
Curb work to allow water to drain - 11/18/2022
Facing northeast - the Charter Oak Bridge with new I-91 Exit 29 to Route 5/15 NB - 11/16/22
Facing south towards Wethersfield Cove - three bridges on I-91 NB widened over: Airport Road; the on-ramp to 5/15 SB and I-91 SB; and Route 5/15 - 11/16/22
Facing west - twoe bridges on I-91 NB widened over: Airport Road; and the on-ramp to 5/15 SB and I-91 SB - 11/16/22
Facing north with Wethersfield Cove on left, I-91 at the Great Meadow Road exits - 11/16/2022
Inspection of electrical illumination 11/10/2022
Impact attenuator system 11/20/2022
Route 5/15 - East Hartford - 11/10/2022
Route 5/15 - East Hartford - 11/10/2022
Bridge joint repairs on the Charter Oak Bridge - 10/28/2022
Bridge joint repairs on the Charter Oak Bridge - 10/28/2022
Bridge joint repairs on I-91 NB - 10/28/2022
Drainage work on Route 5/15 - 10/28/2022
Guiderail installation - 10/28/2022
Paving the last ramp on the project 10/12/2022
Paving the last ramp on the project 10/12/2022
Hydroseeding for erosion control and quick growth of plantings on Reserve Road - 10/12/2022
Reserve Road work was completed and the road reopened - 10/12/2022
Reserve Road work was completed and the road reopened - 10/12/2022
Landscaping and plantings in the former I-91 Exit 29 vicinity - 10/4/2022
Landscaping and plantings in the former I-91 Exit 29 vicinity - 10/4/2022
Work on Reserve Road - 10/4/2022
Reserve Road ready for paving - 10/4/2022
View from Airport Road of paving on I-91 - 9/29/22
Bridge joint work on Route 5/15 over Main Street in East Hartford - 9/29/2022
Line striping of the Charter Oak Bridge- 9/29/2022
Line striping of the Charter Oak Bridge- 9/29/2022
Progress on reconstruction work on Reserve Road - 9/21/2022
Progress on reconstruction work on Reserve Road - 9/21/2022
Progress on reconstruction work on Reserve Road - 9/21/2022
Progress on reconstruction work on Reserve Road - 9/21/2022
Reconstruction work on Reserve Road - 9/19/2022
Closure for reconstruction work on Reserve Road - 9/19/2022
Paving of the commuter parking lot on Main Street in East Hartford - 9/15/22
View of I-91 NB & SB from the Route 3 bridge in Wethersfield - 9/15/22
Line striping prior to re-opening of I-91 NB Exit 28 - 9/9/22
Removing orange temporary attenuators during the re-opening of I-91 NB Exit 28 - 9/9/22
Removing temporary barrier during the re-opening of I-91 NB Exit 28 - 9/9/22
Removing the Ramp Closed sign on the Exit 28 sign during the re-opening - 9/9/22
Removing the Ramp Closed sign on the Exit 28 sign during the re-opening - 9/9/22
View from underneath the new I-91 Exit 29 bridge during bridge inspection - 9/8/2022
View from on top of the new I-91 Exit 29 bridge during bridge inspection - 9/8/2022
View from on top of the new I-91 Exit 29 bridge during bridge inspection - 9/8/2022
Closed I-91 NB Exit 28 - to reopen the night of 9/9/2022
Sinking barrier is now repaired; location is the retaining wall that runs from Abutment 1 of the Charter Oak Bridge south to the gore point of Rte. 5/15 Exit 86 and I-91 SB - 8/31/2022
Sinking barrier is now repaired; location is the retaining wall that runs from Abutment 1 of the Charter Oak Bridge south to the gore point of Rte. 5/15 Exit 86 and I-91 SB - 8/31/2022
Weekend work on Route 5/15 NB bridge over Silver Lane in East Hartford - 8/14/2022
Weekend work on Route 5/15 NB bridge over Silver Lane in East Hartford - 8/14/2022
Weekend work on Route 5/15 NB bridge over Silver Lane in East Hartford - 8/14/2022
Weekend work on Route 5/15 NB bridge over Silver Lane in East Hartford - 8/14/2022
Guiderail installation on I-91 NB - 8/9/2022
Temporary barrier removal for guiderail installation - 8/9/2022
Progress on repair of the sinking barrier - 8/9/2022
View of the new I-91 NB Exit 29 bridge adjacent to Route 5/15 NB Exit 86 - 8/3/2022
Curb installation on I-91 NB - 8/3/2022
Route 5/15 NB deck work & membrane in vicinity of the Main Street Bridge - 8/3/2022
Route 5/15 NB deck work in vicinity of the Main Street Bridge - 8/3/2022
Paving on I-91 SB - 8/3/2022
Progress on the sinking barrier repair - 8/3/2022
Milling on Route 5/15 NB near Exit 90 in East Hartford- 7/27/22
Milling on Route 5/15 NB near Exit 90 in East Hartford- 7/27/22
Paving on the Charter Oak Bridge in Hartford - 7/27/22
Paving on the Charter Oak Bridge in Hartford - 7/27/22
Curbing installation on I-91 NB - 7/20/22
Paving Route 5/15 - 7/20/22
Paving Route 5/15 - 7/20/22
Joint repairs on I-91 NB just past Exit 29 - 7/20/22
Median work on I-91 SB & NB at Exit 25/26 - 7/17/2022
Median work on I-91 SB & NB at Exit 25/26 - 7/17/2022
Concrete repairs on Route 5/15 SB bridge over Main Street in East Hartford - 7/15/2022
Concrete repairs on Route 5/15 SB bridge over Main Street in East Hartford - 7/15/2022
Progress on the sinking barrier repair - 7/15/2022
Route 5/15 NB freshly paved by Exit 87 - 7/15/2022
Concrete repairs on Silver Lane Bridge in East Hartford - 7/13/2022
Concrete repairs on Silver Lane Bridge in East Hartford - 7/13/2022
Milling on the Charter Oak Bridge - 7/7/2022
Paving on Route 5/15 NB underneath the I-91 overpass - 7/7/2022
Paving on Route 5/15 NB underneath the I-91 overpass - 7/7/2022
Paving on Route 5/15 NB underneath the I-91 overpass - 7/7/2022
Paving on Route 5/15 NB underneath the I-91 overpass - 7/7/2022
Paving on Route 5/15 NB underneath the I-91 overpass - 7/7/2022
Painting underneath the Charter Oak Bridge - 6/29/22
Painting underneath the Charter Oak Bridge - 6/29/22
Milling and paving on I-91 NB by former Exit 29 vicinity - 6/29/22
Removing sinking barrier for replacement - 6/26/2022
Milling new former I-91 NB Exit 29 - 6/23/22
Drainage on Route 5/15 - 6/23/22
New I-91 NB Exit 29 and Route 5/15 NB Exit 89 slope work - 6/22/22
Paving Route 5/15 SB Exit 90 vicinity - 6/14/2022
Milling on I-91 NB - 6/14/2022
Milling on I-91 NB - 6/14/2022
Full-depth roadway construction at the bottom of the exit on Airport Road - 6/14/2022
Ramp work and curb removal - 6/13/2022
Milling on I-91 NB - 6/13/2022
Resident Peregrine falcon couple - 6/10/2022; see more photos in the falcon update announcement
Metal rail installation on the Charter Oak Bridge - 6/7/2022
Charter Oak Bridge joint work - 6/7/2022
Charter Oak Bridge joint work - 6/7/2022
Shoulder preparation for guide rail installation - 6/2/2022
Charter Oak Bridge false work removal from underneath bridge - 6/2/2022
Charter Oak Bridge false work removal from underneath bridge - 6/2/2022
Roadway construction at the 5/15 SB Exit 87 ramp - 6/2/2022
Roadway construction at the 5/15 SB Exit 87 ramp - 6/2/2022
Bituminous curb installation - 5/18/2022
Paving former I-91 NB Exit 29 vicinity - 5/18/2022
Road reconstruction under new Exit 20 - 5/18/2022
Road reconstruction under new Exit 20 - 5/18/2022
Road reconstruction under new Exit 20 - 5/18/2022
Installation of top soil on slopes along Main Street vicinity in East Hartford - 5/17/2022
New sound barrier wall along the on-ramp to Route 5/15 SB from Silver Lane in East Hartford - 5/17/2022
Bridge deck reconstruction on 5/15 NB over Main Street in East Hartford - 5/17/2022
New curb on I-91 SB - 5/17/2022
Widening of Route 5/15 approaching the Charter Oak Bridge - 5/7/2022
I-91 NB Airport Road ramp - 5/3/2022
Site of former I-91 NB Exit 29 ramp - 5/3/2022
Commuter lot with plantings in East Hartford - 5/3/2022
Widening of I-91 NB in vicinity of former Exit 29 - 5/3/2022
Widening of I-91 NB in vicinity of former Exit 29 ramp - 5/3/2022
I-91 NB with dedicated left lane for Exit 29-bound travelers - 5/3/2022
Donald Ward, CTDOT District 1, District Engineer presents project progress to ACEC-CT and CMAA members at its 2/25/2022 monthly meeting.
Median work in East Hartford - 4/22/2022
Overhead sign truss assembly - 4/7/2022
Median barrier work in East Hartford - 4/7/2022
Facing north, work on Route 5/15 NB from Exit 90 in East Hartford to the end of the project limits- 4/14/2022
Route 5/15 over Silver lane, East Hartford - 4/14/2022
Route 5/5 in East Hartford at Exit 91 vicinity - 4/14/2022
Route 5/15 over Main Street in East Hartford - 4/14/2022
I-91 and Route 5/15 in the Airport Road vicinity - 4/14/2022
Facing south, I-91 and the Cove Bridge in Wethersfield - 4/14/2022
Charter Oak Bridge - 4/14/2022
New I-91 NB Exit 29 - 4/14/2022