Photos are arranged with the most recent photos on top:
Bridge joint work on the Charter Oak Bridge - 11/18/2022

Curb work to allow water to drain - 11/18/2022

Facing northeast - the Charter Oak Bridge with new I-91 Exit 29 to Route 5/15 NB - 11/16/22

Facing south towards Wethersfield Cove - three bridges on I-91 NB widened over: Airport Road; the on-ramp to 5/15 SB and I-91 SB; and Route 5/15 - 11/16/22

Facing west - twoe bridges on I-91 NB widened over: Airport Road; and the on-ramp to 5/15 SB and I-91 SB - 11/16/22


Facing north with Wethersfield Cove on left, I-91 at the Great Meadow Road exits - 11/16/2022

Inspection of electrical illumination 11/10/2022

Impact attenuator system 11/20/2022

Route 5/15 - East Hartford - 11/10/2022

Route 5/15 - East Hartford - 11/10/2022

Bridge joint repairs on the Charter Oak Bridge - 10/28/2022

Bridge joint repairs on the Charter Oak Bridge - 10/28/2022

Bridge joint repairs on I-91 NB - 10/28/2022

Drainage work on Route 5/15 - 10/28/2022

Guiderail installation - 10/28/2022

Paving the last ramp on the project 10/12/2022

Paving the last ramp on the project 10/12/2022

Hydroseeding for erosion control and quick growth of plantings on Reserve Road - 10/12/2022

Reserve Road work was completed and the road reopened - 10/12/2022

Reserve Road work was completed and the road reopened - 10/12/2022

Landscaping and plantings in the former I-91 Exit 29 vicinity - 10/4/2022

Landscaping and plantings in the former I-91 Exit 29 vicinity - 10/4/2022

Work on Reserve Road - 10/4/2022

Reserve Road ready for paving - 10/4/2022

View from Airport Road of paving on I-91 - 9/29/22

Bridge joint work on Route 5/15 over Main Street in East Hartford - 9/29/2022

Line striping of the Charter Oak Bridge- 9/29/2022

Line striping of the Charter Oak Bridge- 9/29/2022

Progress on reconstruction work on Reserve Road - 9/21/2022

Progress on reconstruction work on Reserve Road - 9/21/2022

Progress on reconstruction work on Reserve Road - 9/21/2022

Progress on reconstruction work on Reserve Road - 9/21/2022

Reconstruction work on Reserve Road - 9/19/2022

Closure for reconstruction work on Reserve Road - 9/19/2022

Paving of the commuter parking lot on Main Street in East Hartford - 9/15/22

View of I-91 NB & SB from the Route 3 bridge in Wethersfield - 9/15/22

Line striping prior to re-opening of I-91 NB Exit 28 - 9/9/22

Removing orange temporary attenuators during the re-opening of I-91 NB Exit 28 - 9/9/22

Removing temporary barrier during the re-opening of I-91 NB Exit 28 - 9/9/22

Removing the Ramp Closed sign on the Exit 28 sign during the re-opening - 9/9/22

Removing the Ramp Closed sign on the Exit 28 sign during the re-opening - 9/9/22

View from underneath the new I-91 Exit 29 bridge during bridge inspection - 9/8/2022

View from on top of the new I-91 Exit 29 bridge during bridge inspection - 9/8/2022

View from on top of the new I-91 Exit 29 bridge during bridge inspection - 9/8/2022

Closed I-91 NB Exit 28 - to reopen the night of 9/9/2022

Sinking barrier is now repaired; location is the retaining wall that runs from Abutment 1 of the Charter Oak Bridge south to the gore point of Rte. 5/15 Exit 86 and I-91 SB - 8/31/2022

Sinking barrier is now repaired; location is the retaining wall that runs from Abutment 1 of the Charter Oak Bridge south to the gore point of Rte. 5/15 Exit 86 and I-91 SB - 8/31/2022

Weekend work on Route 5/15 NB bridge over Silver Lane in East Hartford - 8/14/2022

Weekend work on Route 5/15 NB bridge over Silver Lane in East Hartford - 8/14/2022

Weekend work on Route 5/15 NB bridge over Silver Lane in East Hartford - 8/14/2022

Weekend work on Route 5/15 NB bridge over Silver Lane in East Hartford - 8/14/2022

Guiderail installation on I-91 NB - 8/9/2022

Temporary barrier removal for guiderail installation - 8/9/2022

Progress on repair of the sinking barrier - 8/9/2022

View of the new I-91 NB Exit 29 bridge adjacent to Route 5/15 NB Exit 86 - 8/3/2022

Curb installation on I-91 NB - 8/3/2022

Route 5/15 NB deck work & membrane in vicinity of the Main Street Bridge - 8/3/2022

Route 5/15 NB deck work in vicinity of the Main Street Bridge - 8/3/2022

Paving on I-91 SB - 8/3/2022

Progress on the sinking barrier repair - 8/3/2022

Milling on Route 5/15 NB near Exit 90 in East Hartford- 7/27/22

Milling on Route 5/15 NB near Exit 90 in East Hartford- 7/27/22

Paving on the Charter Oak Bridge in Hartford - 7/27/22

Paving on the Charter Oak Bridge in Hartford - 7/27/22

Curbing installation on I-91 NB - 7/20/22

Paving Route 5/15 - 7/20/22

Paving Route 5/15 - 7/20/22

Joint repairs on I-91 NB just past Exit 29 - 7/20/22

Median work on I-91 SB & NB at Exit 25/26 - 7/17/2022

Median work on I-91 SB & NB at Exit 25/26 - 7/17/2022

Concrete repairs on Route 5/15 SB bridge over Main Street in East Hartford - 7/15/2022

Concrete repairs on Route 5/15 SB bridge over Main Street in East Hartford - 7/15/2022

Progress on the sinking barrier repair - 7/15/2022

Route 5/15 NB freshly paved by Exit 87 - 7/15/2022

Concrete repairs on Silver Lane Bridge in East Hartford - 7/13/2022

Concrete repairs on Silver Lane Bridge in East Hartford - 7/13/2022

Milling on the Charter Oak Bridge - 7/7/2022

Paving on Route 5/15 NB underneath the I-91 overpass - 7/7/2022

Paving on Route 5/15 NB underneath the I-91 overpass - 7/7/2022

Paving on Route 5/15 NB underneath the I-91 overpass - 7/7/2022

Paving on Route 5/15 NB underneath the I-91 overpass - 7/7/2022

Paving on Route 5/15 NB underneath the I-91 overpass - 7/7/2022

Painting underneath the Charter Oak Bridge - 6/29/22

Painting underneath the Charter Oak Bridge - 6/29/22

Milling and paving on I-91 NB by former Exit 29 vicinity - 6/29/22

Removing sinking barrier for replacement - 6/26/2022

Milling new former I-91 NB Exit 29 - 6/23/22

Drainage on Route 5/15 - 6/23/22

New I-91 NB Exit 29 and Route 5/15 NB Exit 89 slope work - 6/22/22

Paving Route 5/15 SB Exit 90 vicinity - 6/14/2022

Milling on I-91 NB - 6/14/2022

Milling on I-91 NB - 6/14/2022

Full-depth roadway construction at the bottom of the exit on Airport Road - 6/14/2022

Ramp work and curb removal - 6/13/2022

Milling on I-91 NB - 6/13/2022

Resident Peregrine falcon couple - 6/10/2022; see more photos in the falcon update announcement

Metal rail installation on the Charter Oak Bridge - 6/7/2022

Charter Oak Bridge joint work - 6/7/2022

Charter Oak Bridge joint work - 6/7/2022

Shoulder preparation for guide rail installation - 6/2/2022

Charter Oak Bridge false work removal from underneath bridge - 6/2/2022

Charter Oak Bridge false work removal from underneath bridge - 6/2/2022

Roadway construction at the 5/15 SB Exit 87 ramp - 6/2/2022

Roadway construction at the 5/15 SB Exit 87 ramp - 6/2/2022

Bituminous curb installation - 5/18/2022

Paving former I-91 NB Exit 29 vicinity - 5/18/2022

Road reconstruction under new Exit 20 - 5/18/2022

Road reconstruction under new Exit 20 - 5/18/2022

Road reconstruction under new Exit 20 - 5/18/2022

Installation of top soil on slopes along Main Street vicinity in East Hartford - 5/17/2022

New sound barrier wall along the on-ramp to Route 5/15 SB from Silver Lane in East Hartford - 5/17/2022

Bridge deck reconstruction on 5/15 NB over Main Street in East Hartford - 5/17/2022

New curb on I-91 SB - 5/17/2022

Widening of Route 5/15 approaching the Charter Oak Bridge - 5/7/2022

I-91 NB Airport Road ramp - 5/3/2022

Site of former I-91 NB Exit 29 ramp - 5/3/2022

Commuter lot with plantings in East Hartford - 5/3/2022

Widening of I-91 NB in vicinity of former Exit 29 - 5/3/2022

Widening of I-91 NB in vicinity of former Exit 29 ramp - 5/3/2022

I-91 NB with dedicated left lane for Exit 29-bound travelers - 5/3/2022

Donald Ward, CTDOT District 1, District Engineer presents project progress to ACEC-CT and CMAA members at its 2/25/2022 monthly meeting.

Median work in East Hartford - 4/22/2022

Overhead sign truss assembly - 4/7/2022

Median barrier work in East Hartford - 4/7/2022

Facing north, work on Route 5/15 NB from Exit 90 in East Hartford to the end of the project limits- 4/14/2022

Route 5/15 over Silver lane, East Hartford - 4/14/2022

Route 5/5 in East Hartford at Exit 91 vicinity - 4/14/2022

Route 5/15 over Main Street in East Hartford - 4/14/2022

I-91 and Route 5/15 in the Airport Road vicinity - 4/14/2022

Facing south, I-91 and the Cove Bridge in Wethersfield - 4/14/2022

Charter Oak Bridge - 4/14/2022

New I-91 NB Exit 29 - 4/14/2022