The following photos are in order with most recent on the top:
Facing south, foundation for the new sound barrier wall along Route 5/15 SB on-ramp - 12/9/2021

Facing north, foundation for the new sound barrier wall along Route 5/15 SB on-ramp - 12/9/2021
Facing north, new sound barrier along Route 5/15 NB, from over Main Street to over Silver Lane, in East Hartford - 12/9/2021

Sound barrier wall installation along Route 5/15 NB south of Exit 91 - 11/16/2021

Sound barrier wall installation along Route 5/15 NB south of Exit 91 - 11/16/2021

I-91 NB widening at new Exit 29 vicinity - 11/11/2021

I-91 NB widening north of Airport Road bridge - 11/11/2021

I-91 NB widening past Airport Road - 11/10/2021

I-91 NB widening past Airport Road - 11/10/2021

Airport Road lowering and widened bridge 11/10/2021

Main Street Bridge with membrane applied; paving next - 11/10/2021

Main Street Bridge with membrane applied - 11/10/2021

Paving on I-91 Southbound at night - 11/2/2021
Route 5/15 NB widening in East Hartford; Wall 107 by Exit 91 to Silver Lane 11/3/2021
Route 5/15 NB widening in East Hartford; parapet 11/3/2021
Route 5/15 NB widening in East Hartford; Main Street on ramp 11/3/2021

Route 5/15 NB widening in East Hartford; Main Street on ramp, facing south 11/3/2021

Route 5/15 NB widening before Exit 91 in East Hartford - Retaining Wall - 10/21/2021

Route 5/15 widening before Exit 91 in East Hartford - 10/21/2021

I-91 NB widening at Exit 27 - 10/21/2021

I-91 NB widening at Exit 27 - 10/21/2021

I-91 NB widening north of Exit 27 - 10/19/2021

I-91 NB widening north of Exit 27 - 10/19/2021

I-91 NB widening north of Exit 27 - 10/19/2021

Hot membrane installation on I-91 NB bridges - 10/19/2021

Hot membrane installation on I-91 NB bridges - 10/19/2021

Sound barrier wall installation on Route 5/15 NB over Silver Lane in East Hartford - 10/15/21

Sound barrier wall installation on Route 5/15 NB over Silver Lane in East Hartford - 10/15/21

Route 5/15 NB widening over Main Street vicinity in East Hartford - 10/07/2021

Route 5/15 NB widening over Main Street vicinity in East Hartford - 10/07/2021

View of Route 5/15 NB bridge widening from Main Street in East Hartford - 10/07/2021

Route 5/15 NB temporary left lane closure - 9/13/2021

Route 5/15 NB temporary left lane closure - 9/13/2021

Median drainage and paving in Wethersfield - 9/1/2021

Paving Airport Road - 9/1/2021

Route 5/15 widening by Exit 90 - 9/1/2021

Route 5/15 NB widening after the Charter Oak Bridge in East Hartford - 8/19/2021

Abutment joint installation on the Charter Oak Bridge - 8/20/2021

Abutment joint installation on the Charter Oak Bridge - 8/20/2021

Widening of Route 5/15 NB over Main Street in East Hartford - 8/16/2021

Widening of Route 5/15 NB over Main Street in East Hartford - 8/16/2021

Demolition of the final pier of the former Exit 29 ramp - 1 of 3 series - 8/13/2021

Demolition of the final pier of the former Exit 29 ramp - 2 of 3 series - 8/13/2021

Demolition of the final pier of the former Exit 29 ramp - 3 of 3 series - 8/13/2021

Nighttime paving on I-91 - 8/5/2021

Nighttime paving on I-91 - 8/5/2021

Work on I-91 NB on the Cove Bridge - 7/12/21

Facing south, I-91 NB widening, including three bridges - 7/12/21

Facing north, new I-91 NB Exit 29 - 7/12/21

New I-91 NB Exit 29 bridge over Route 5/15 SB - 7/12/21

Former I-91 NB Exit 29 demolition - 7/12/21

Route 5/15 NB widening in East Hartford's Main Street vicinity - 7/12/21

Route 5/15 NB widening in East Hartford's Exit 91 and Silver Lane vicinity - 7/12/21

Steel erection on the Charter Oak Bridge - 7/14/21

Steel erection on the Charter Oak Bridge - 7/14/21

Steel erection on the Charter Oak Bridge - top view - 7/14/21

Peregrine Falcon nesting on the Charter Oak Bridge 7/13/2021

Peregrine Falcon nesting on the Charter Oak Bridge 7/13/2021

Former I-91 NB Exit 29 demolition- 7/13/21

Former I-91 NB Exit 29 demolition - 7/13/21

Former I-91 NB Exit 29 - 7/13/21

Retaining wall 107 for Route 5/15 NB widening in Main Street vicinity in East Hartford - 7/8/21

Route 5/15 NB widening over Main Street in East Hartford - 7/8/21

Route 5/15 NB widening over Silver Lane in East Hartford - 7/8/21

Former Exit 29 demolition 7/1/21

Former Exit 29 demolition 7/1/21

Cove Bridge Deck clean-up 6/30/2021

Cove Bridge Deck clean-up 6/30/2021

Route 5/15 widening north of Silver Lane in East Hartford 6/30/21

Wall 106 - Main Street vicinity in East Hartford 6/30/21

Former Exit 29 demolition 6/30/21

Progress on I-91 bridge over Route 5/15 - 6/24/21

Progress on I-91 bridge over Route 5/15 - 6/24/21

I-91 over Airport Rd on-ramp to I-91 SB - 6/24/21

Progress on the Route 5/15 lowering in the Exit 87 vicinity - 6/24/21

Progress on the I-91 bridge over Airport Road - 6/24/21

Former Exit 29 demolition progress - 6/24/21

Former Exit 29 demolition progress - 6/24/21

Former Exit 29 demolition progress - 6/24/21

Former Exit 29 in the process of being demolished - 6/15/21

From street view, former Exit 29 in the process of being demolished - 6/15/21

I-91 NB Bridge over Route 5/15 - 6/4/2021



Facing north toward the Charter Oak Bridge, view from the new I-91 NB Exit 29.

Facing south, the new I-91 NB Exit 29

Widening of Route 5/15 at Silver Lane in East Hartford

Wall 107, for widening of Route 5/15. along Exit 91 to Silver Lane in East Hartford

CTDOT Commissioner Joseph Giulietti addresses gives opening remarks at the I-91 NB Exit 29 Opening Event

CTDOT District 1 District Engineer addresses attendees at the event

Governor Ned Lamont addresses attendees

Project Team with Governor Ned Lamont

Widening and deck construction for I-91 bridge over Airport Road on ramp to I-91 SB - 5/10/21

I-91 NB widening in the vicinity of Exit 28 - 5/10/21

Facing south, paving of the new bridge approach to the Charter Oak Bridge - 5/7/21

New median barrier on Route 5/15 - 5/7/21

New I-91 NB Exit 29 bridge approach - 5/7/21

New I-91 NB Exit 29 bridge approach - 5/7/21

Overhead sign installation 4/28/21

Steel erection on the Route 5/15 bridge over Silver Lane in East Hartford 4/28/21

Setting false work to start building the new concrete girders for the widening of Route 5/15 NB over Main Street in East Hartford - 4/20/21
New steel girders for the I-91 NB widening over Route 5/15 - 4/1/2021

New bridge deck for I-91 NB Exit 29 bridge - 4/1/2021

Retaining wall construction for new on-ramp to Route 5/15 NB - 4/1/2021

Parapet installation on retaining wall - 4/1/2021

Parapet installation on retaining wall - 4/1/2021

March is National Women's Month -
Click for larger view of photo below.
International Women's Day - March 8, 2021

Median barrier work as seen from the I-91 NB bridge widening over Route 5/15. - 3/18/2021

Median barrier work on Route 5/15 under the I-91 NB bridge widening - 3/18/2021

I-91 NB bridge widening over Route 5/15 - 3/18/2021

Median drainage work, Wethersfield - 3/18/2021

Widening of I-91 NB bridge over Route 5/15 - January 2021

Widening of I-91 NB bridge over Airport Road - January 2021

Widening of I-91 bridge over the on ramp to I-91 SB and Route 5/15 SB - January 2021

Facing south, the path for the future I-91 NB Exit 29 - January 2021

Widening of the Route 5/15 bridge over Main Street in East Hartford - January 2021

Widening of the Route 5/15 bridge over Silver Lane in East Hartford - January 2021

The new I-91 NB Exit 29 Bridge seen from I-91 SB ground level.
Charter Oak Bridge joint construction - 2/18/2021

I-91 Bridge over Airport Road widening - 2/18/2021

Facing south, view of wall 104 - the future on-ramp bridge that will merge onto Route 5/15 - 2/18/2021

Facing the Charter Oak Bridge, view from wall 104 and the end of the future on-ramp bridge that will merge onto Route 5/15 - 2/18/2021

Facing the Charter Oak Bridge, view from wall 104 and the end of the future on-ramp bridge that will merge onto Route 5/15 - 2/11/2021

Joint replacement on the Charter Oak Bridge - 2/11/2021

Facing north toward the Charter Oak Bridge, progress on the construction for future I-91 NB Exit 29 ramp to Route 5/15 NB.

Facing north, toward the Charter Oak Bridge, retaining wall construction for future on ramp to Route 5/15 NB

As above, retaining wall construction for future on ramp to Route 5/15 NB - 1/21/2021

Airport Road demolition for widening - 1/21/2021

Main Street Bridge in East Hartford with pile driving for widening completed - 1/21/2021


Main Street Bridge pile driving for widening 1/6/2021

Silver lane Bridge construction for widening 1/6/2021

Route 5/15 NB traffic shifted onto the widened Charter Oak Bridge!! 12/16/2020