ROAD/LANE CLOSURES
 
CONTINUOUS ROAD CLOSURE:
 
Nighttime Lane Closures possible Sunday through Friday nights, 9/25 through 9/29 between the hours of 8:00 PM and 6:00 AM, weather permitting:
  • Highway
    • I-91 NB (Exit 24 to Exit 29) for paving, bridge joint work and grooved striping
    • I-91 SB (Whitehead Highway to Exit 26) for bridge joint work  
    • Route 5/15 NB (I-91 Exit 29 to Exit 91) for grooved striping work
    • Route 5/15 SB (I-84 WB to Exit 90) for paving 
    • I-84 WB (Exit 57 ramp to Route 5/15 SB) for paving

  • Local Roads:
    • Airport Road in Hartford for patching and milling
 
Nighttime Ramp and Road Closures and Detours are possible between the hours of 8:00 PM and 6:00 AM, weather permitting, as follows - click each for detour routes):
NOTE: Ramps with conflicting detours will not be closed at the same time

No road or lane closures are anticipated Friday and Saturday, 9/30 & 10/1.
 
LONG-TERM ROADWAY CLOSURES AND DETOURS


What's Happening Now

  • Completing bridge joints on Charter Oak Bridge (bridge 6000)
  • Continue Route 15 median work in East Hartford
  • Continue reconstruction of Route 15 SB Exit 86 gore
  • Continue ramp milling and paving project wide
  • Continue installation of new highway lighting throughout project
  • Continue work shim paving and final paving of I-91 and Route 5/15 NB
  • Continue grading slopes, installing new landscaping and turf establishment
  • Installing new metal beam rail and curb